🔒
This traveler is closed
This unit has been completed. If you need it opened again, ask QC.

PRODUCTION SETUP

QC: set up each unit here before it goes on the line. A unit needs its Sales Order and Engineering Prints; Change Orders are optional.

Import units from the production schedule
Choose the schedule workbook (.xlsx) or a CSV, tick the weeks to import, and check the preview. Floors A, B and C of the same serial become one home; the letters decide how many sections it has. Notes come from column F (Misc Notes). QC adds the sales order and engineering prints afterwards, and each unit stays locked until they are in.

QR label sheet

Labels you create or add from the Units list collect here and print together, 10 to a sheet of 8.5 x 11 paper (2 across, 5 down), instead of one sheet per home.

Units

UNITS ON THE LINE

Tap a unit to open its traveler, or scan the QR label on the unit. You can look at any unit without signing in; sign in (banner above) to make changes.

📷
Scan the QR label on the unit
Use the camera on this tablet. The unit's traveler opens right away.
Label won't scan? Type the serial number
View only — nothing here can be changed. Staff: sign in to edit
🔒

PRODUCTION SEQUENCE CHECKLIST (TRAVELER)

Cavco Industries • Phoenix, Arizona • Construction & Safety Standards

DOC: 00.20.21 REV: A (07/08/2026) THIRD PARTY: NTA INC.
0 / 0 Checkpoints SAT (0%)

PRODUCTION LINE

Loading…
On trackOpen shortageOpen UNS (red box, or red tag)
Open items by supervisor